We now offer a comprehensive, start-to-finish turbine valve seat replacement service designed to fit seamlessly within your outage schedule.
During your planned outage, our team will manufacture a new, precision-machined turbine valve seat to meet your exact specifications and operating requirements. Once fabrication and quality checks are complete, we mobilize to your site with the new component in hand, ready for immediate installation.
Our field specialists will carefully remove the existing valve seat, perform any necessary inspections or surface preparation, and install the new seat to ensure proper fit, alignment, and performance. We work efficiently and in close coordination with your outage team to minimize downtime and keep your schedule on track.
From manufacturing through on-site installation, the entire process is completed in approximately 12 days, helping you return to service quickly and with confidence in the reliability of your turbine system.
| Project Name | AEP Knox Lee |
| Project Description | Replace two control valve seats on GE turbine |
| Capabilities Applied/Processes |
Primary:
Secondary:
|
| Equipment Used to Manufacture Part |
CNC lathe CNC Mill Climax portable boring bar Portable machine shop 20’ Connex |
| Material Used |
2-1/4 chrome P22 material Stellite 21 |
| Duration of project | 14 days to manufacture, remove and install 2 seats |