When you don’t have a replacement turbine valve seat available, we can manufacture a new one—typically within eight days—deliver it to your site, remove the existing seat, and install the new component as part of your outage scope.
In one recent project involving three control valve (CV) seats on a GE turbine, we reverse engineered the components and completed back-to-back manufacturing and installation in just 17 days from purchase order to final completion.
| Project Name | AEP Wilkie |
| Project Description | Replace one control valve seats on GE turbine |
| Capabilities Applied/Processes |
Primary:
Secondary:
|
| Equipment Used to Manufacture Part |
CNC lathe CNC Mill Climax portable boring bar Portable machine shop 20’ Connex |
| Material Used |
2-1/4 chrome P22 material Stellite 21 |
| Duration of project | 11 Days to manufacture remove and install 1 seat |